
Main Ingredients
High-quality polymer emulsion, natural quartz sand, titanium dioxide, eco-friendly additives, deionized water, etc.

Features of Textured Coating
1.Made with natural quartz sand for a luxurious, natural effect.
2.Presents a unique three-dimensional, thick stone-like appearance.
3.Excellent weather resistance, water, and acid-alkali resistance; mold and algae-proof.
4.Good color rendering, stable coloration, resistant to fading and discoloration.
5.Strong adhesion, not easy to peel off.
6.Easy application, suitable for various curved and vertical surfaces.
7.Eco-friendly, with no detected formaldehyde, benzene compounds, or heavy metals.

Technical Parameters
- Theoretical Coverage: Varies depending on the process; trowel-applied: ~2-3 kg/m²/2 coats, spray-applied: ~3-3.5 kg/m²/2 coats. Actual coverage may differ based on individual techniques and processes.
- Dilution Ratio: No dilution required.
- Drying Time: Surface dry ~3-4 hours; recoating minimum 24 hours (25°C, 50% relative humidity). Adjust for lower temperatures.
- Curing Time: 7 days/25°C. For temperatures below 5°C, extend curing time for optimal coating effects.
- Standards Compliance: GB18582-2020, JG/T24-2018.
- Specifications: 28KG/bucket, 50KG/bucket.
- Shelf Life: Refer to product label.

Application System
System |
Product |
Application Method |
Coats |
Theoretical Consumption |
Base Layer |
Anti-Crack Exterior Putty |
Full Trowel Application |
2 coats |
- |
Primer Layer |
Transparent Penetrating Primer |
Rolling/Spraying |
1 coat |
- |
Intermediate Layer |
Exterior Wall Middle Coating |
Rolling/Spraying |
1 coat |
- |
Topcoat |
Multi-Color Water-Based Sand |
Spraying |
1-2 coats |
1.2-1.8 kg/m² |
Protective Coat |
Self-Cleaning Topcoat |
Rolling/Spraying |
1 coat |
- |
Application Instructions
1. Base Layer Preparation:
o Use high-quality waterproof and alkali-resistant exterior putty.
o Mix the putty as per product instructions to ensure proper consistency.
o Apply 1-2 coats evenly and allow each layer to dry completely.
2.Primer Application:
o Stir the transparent primer thoroughly before use.
o Apply 1 coat using a roller or sprayer, ensuring uniform coverage without missing any areas.
3.Intermediate Coating:
o Stir the intermediate coating evenly. Apply 1 coat using a roller or sprayer.
o Ensure an even thickness without exposing the base surface.
4.Topcoat Application:
o Stir the main coating gently with a wooden stick (do not use a mechanical mixer).
o Use a dedicated spray gun to spray 1-2 coats evenly with consistent speed and motion. oEnsure a uniform texture without drips or accumulation.
5.Protective Topcoat:
o Stir the topcoat thoroughly before use. oApply 1 coat with a roller or sprayer for added durability and self-cleaning properties.

Precautions
1. Base Surface Inspection:
o Strictly inspect the base surface according to national standards before application.
o Ensure the surface is flat, clean, solid, and free of grease, mold, algae, dust, and other contaminants.
o The pH value must be <10 and the moisture content <10% to meet application conditions.
o Avoid application when the wall temperature is below 5°C, relative humidity exceeds 80%, or during strong winds, rain, snow, or thunderstorms.
2. Worker Safety:
o Workers must wear protective equipment such as safety goggles, gloves, and professional work attire according to local work standards.
o Ensure that suspended platforms, scaffolding, or other tools are sturdy and reliable.
3. Construction Planning:
o Plan work areas and team size carefully to ensure each working surface is completed in one go.
o Position handover points at floor separations, internal and external corners to avoid visible seams.
o Use the same batch and color of materials for the same project or working surface to prevent color variation.
4. Control of Expansion Joints:
o Plan expansion joints scientifically to prevent cracking and ensure the decorative finish.
o Separation Joint Technique: After the primer dries, mark lines, divide sections, and tape off with masking tape according to design requirements. Remove the tape before the main coat dries.
o For areas smaller than 0.5 m², black primer is recommended to improve work efficiency. 5. Material Handling and Operation:
o Follow the recommended water dilution ratio and construction techniques. Operate according to specified guidelines.
6. Tool Cleaning and Waste Disposal:
o If work is interrupted or completed, clean tools immediately with clean water.
o Do not dispose of leftover paint or waste materials in drains or water sources.
o Waste materials, including containers and unused paint, must be handled according to local environmental regulations.
7. Eye Contact:
o If the product comes into contact with the eyes, rinse thoroughly with clean water. Seek medical attention if discomfort persists.
8. Authenticity Assurance:
o To protect user rights, avoid purchasing products with incomplete labeling. Be cautious of counterfeit goods.
9. Further Information:
o Contact your local distributor for additional product details or manuals.
Get in Touch With Matex YG

Matex YG News & Insights

The Ultimate Guide to Applying Diatomaceous Earth: Indoors, Outdoors, and on Plants

Activated Carbon vs Charcoal: Understanding the Difference and Their Use in Air Filters
